BriBlog, Huppstead
Lakeside Addition – The Dog Days
Gratuitous whining about various struggles from the end of June through late July.
BriBlog, Huppstead
Gratuitous whining about various struggles from the end of June through late July.
BriBlog, Huppstead
The new windows (at least most of them) were delivered and installed.
BriBlog, Huppstead
Renovation of the existing house walls and floors
BriBlog, Huppstead
With the framing of the addition complete, it was time to tackle demolition of the old house. As the demolition proceeded, the need for more and more demolition was revealed until very little remained of the original house.
BriBlog, Huppstead
Roof framing for the addition was mostly completed. Still needs to be tied in with existing house roof frame.
BriBlog, Huppstead
Today, the walls for the addition were completed with the sheathing and wrapping of the exterior walls, and the framing of the interior walls.
BriBlog, Huppstead
Addition framing continues with laying of the sub-floor and erection of the outside walls.
BriBlog, Huppstead
Framing of the basement wood-framed walls.
BriBlog, Huppstead
With the concrete poured, finished, and cured, the foundation is complete. Framing of the addition can now begin.